# **25 Pre-Concreting Checks Every Site Engineer Must Complete** Based on your uploaded infographic, here are all 25 checks, arranged under the same five categories. ## **1. Drawings & Approvals (1–5)** 1\. **Latest Approved Drawings:** Latest approved structural drawings and relevant MEP drawings (where embedded services are involved) are available at site. 2\. **Concrete Grade & Mix Design:** Specified concrete grade (e.g., M20 / M25 / M30 etc.), approved mix design (or site mix as per specification) and requirements are verified.\ *Note: IS 456 specifies M20 as the minimum grade for RCC under normal conditions.* 3\. **Pouring Sequence:** Pouring sequence, construction joints and their approved locations are confirmed. 4\. **Method Statement & Safety:** Method statement and safety arrangements (PPE, access, fall protection, etc.) are approved and communicated. 5\. **Previous Inspection Clearance:** All previous inspection observations are resolved and required RFI ap...
ऐ तस्वीरों में बसर करने वाले,
ज़रा निकल कर तस्वीरों से बाहर तो आ।
कब तक ख्यालों में मैं इश्क फरमाता रहूँ,
आ बैठ किसी शाम बहाने चाय के ही गुफ्तगू फरमा।
English translation-
O living in pictures,
Just come out of the pictures.
How long do I keep flirting with thoughts,
Come and sit on the pretext of tea for some evening.

Nyc
ReplyDeletethanks.....keep supporting and share my blog
ReplyDeletefantastic
ReplyDelete