# **25 Pre-Concreting Checks Every Site Engineer Must Complete** Based on your uploaded infographic, here are all 25 checks, arranged under the same five categories. ## **1. Drawings & Approvals (1–5)** 1\. **Latest Approved Drawings:** Latest approved structural drawings and relevant MEP drawings (where embedded services are involved) are available at site. 2\. **Concrete Grade & Mix Design:** Specified concrete grade (e.g., M20 / M25 / M30 etc.), approved mix design (or site mix as per specification) and requirements are verified.\ *Note: IS 456 specifies M20 as the minimum grade for RCC under normal conditions.* 3\. **Pouring Sequence:** Pouring sequence, construction joints and their approved locations are confirmed. 4\. **Method Statement & Safety:** Method statement and safety arrangements (PPE, access, fall protection, etc.) are approved and communicated. 5\. **Previous Inspection Clearance:** All previous inspection observations are resolved and required RFI ap...
ना चूङि ना कंगन हाथो में एक घङी का ही किरदार है,
ना बिंदीया ना लाली आँखो में बस हल्के काजल की धार है।
अमा बङे सादगी से निकली है वो,
हाँ वो काॅलेज के लिए तैयार है।
English translation-
Neither the bangle nor the bracelet is the character of a watch in the hands,
Neither the forehead point nor the lipstick is just a light mascara in the eyes.
Dear friend, she has come out of great simplicity,
Yes, he is ready for college.

Comments
Post a Comment