# **25 Pre-Concreting Checks Every Site Engineer Must Complete** Based on your uploaded infographic, here are all 25 checks, arranged under the same five categories. ## **1. Drawings & Approvals (1–5)** 1\. **Latest Approved Drawings:** Latest approved structural drawings and relevant MEP drawings (where embedded services are involved) are available at site. 2\. **Concrete Grade & Mix Design:** Specified concrete grade (e.g., M20 / M25 / M30 etc.), approved mix design (or site mix as per specification) and requirements are verified.\ *Note: IS 456 specifies M20 as the minimum grade for RCC under normal conditions.* 3\. **Pouring Sequence:** Pouring sequence, construction joints and their approved locations are confirmed. 4\. **Method Statement & Safety:** Method statement and safety arrangements (PPE, access, fall protection, etc.) are approved and communicated. 5\. **Previous Inspection Clearance:** All previous inspection observations are resolved and required RFI ap...
कब तक उल्झा रहूँ तेरे इन तस्वीरों में,
इनमें तेरे लबों की आवाज नहीं।
मैं क्या करूँ उन यादों का,
जिनमें तेरे होने का अहसास नहीं।
तू ना रहता तो भूल भी जाऊँ,
तेरे होनें पर भी तू मेरे पास नहीं।
English translation-
How long will I be disappointed in these pictures of you,
There is no voice of your lips in them.
What do I do with those memories,
In which you do not feel like being.
If you don't live then I forget you too
But you are not with me.

Amazing 👍
ReplyDelete